Home » Archive

Articles witg tags: ventilation

News, Specials »

[28 Apr 2016 | 794 read]
Machine building in Bulgaria. TANGRA is expanding on new markets.” Interview for Capital newspaper with Dipl. Eng. July Armianov, owner of TANGRA and member of the board of Bulgarian Chamber of Machine Building

Paris, 1998. International Exhibition on Heating, Ventilation and Air-Conditioning. “An exhibitor at the stall of a Belgian company noticed my interest and asked: “Sir, do you know what this is?”. I replied: “Yes, I do. We have been producing heat exchangers like these in Bulgaria for 10 years”. A little anxious, the exhibitor asked: “Excuse me, sir, where is Bulgaria?”.

Air conditioning, Ventilation »

[3 Mar 2016 | 676 read]
Energy efficient HVAC systems for maintenance microclimate

During the second half of 2015 TANGRA completed the installations of Abrites OOD’s administrative and production building in Sofia. The production plant will be specialized in the assembling of electronic modules.

The design and building assignment involved heating, ventilation and air-conditioning systems for production section, offices and auxiliary premises. The main task of the design process was to achieve conformity with the regulatory requirements for microclimate, while maintaining the optimum capital investments/energy costs ratio.

Air conditioning, Heating, Titles, Ventilation »

[2 Mar 2016 | 1,002 read]
TANGRA Designed And Executed The ventilation, heating and air conditioning systems in the newest office building of the largest Bulgarian Bank

At the end of 2015 TANGRA’s team completed the ventilation, heating and air conditioning installations in new administrative building, located near the tunnel at the “Pencho Slaveykov” blvd. in Sofia. It is the second stage of a private investment, intended for a business building to meet the needs of “UniCredit Bulbank”. The total floor area of the two buildings is 18 500 sq.m.

The new building is multifunctional and it accommodates offices, a restaurant, a kitchen for the restaurant, a fitness centre, a commercial shop and an underground parking. The people, employed in the building and using its offices on a daily basis exceed one thousand.

The stylish new façade corresponds to the exiting building, which was completed in 2009 (stage I) and establishes a completely new appearance of the entire area. Thanks to the excellent performance and satisfying the occupant’s needs in the first stage, the specialists from TANGRA were invited to design and were awarded the contract for the implementation of the HVAC installations in the second stage of the project.

Air conditioning, Ventilation »

[21 Jul 2015 | 4,487 read]
Air handling units TANGRA AHU  – guarantee for the air quality!

Modern buildings are better and better thermally insulated and the joinery (of the windows and doors) – more and more tightly closed.

Naturally the association with a thermos arises where the coffee is hot and aromatic, even after 12 hours. The only disadvantage is that we live in this thermos!

People in industrialized countries spend between 70 % and 90 % of their lives in closed premises. The lack of sufficient quantity fresh air leads to reduced working capacity, increase in allergies and diseases, especially of children and young people.

There is a solution – healthy, energy-saving and environmental!

Air handling units of TANGRA are designed to meet the needs of ventilation, heating, cooling and energy recuperation of various types and purposes public and industrial buildings. All ventilation and air conditioning units are designed on a modular basis, which facilitates their transportation and installation.

Heating, Ventilation »

[19 Jun 2015 | 1,120 read]
High efficency heating and ventilation of the canning company “Palirria” Nova Zagora

One of the projects where a good cooperation has been reached between the customer who knows what he wants, designer and performer who can do it, is a new canning enterprise “Palirriya”.

The factory is a new investment of “Palirria Bulgaria” and as a result of experience gained they were able to prepare a precise specification. One of their requirements was the recuperation (recovery) of energy from the exhausted air.

The technological process is connected with intensive discharge of heat and moisture from certain work stations. Local suction helps the air exchange to be minimized, but still the ventilated air from the general circulation ventilation is more than 24 000 m³ / h.

Air conditioning, Ventilation »

[1 Jun 2015 | 1,003 read]
Air Conditioning and ventilation systems of Hall 272  in the Law Faculty of Sofia University “St. Kliment Ohridski”

Hall 272 at Sofia University became “oddly” popular during the student occupation in autumn of 2013. Actually, it is the largest lecture hall in Alma Mater, with a capacity of 715 seats. The student exams hold in it, the rectors select there and the future lawyers of Bulgaria prepare.

Air conditioning, News, Ventilation »

[19 May 2015 | 1,395 read]
Ventilation, air conditioning and technological  installations in wineries and wine cellars

TANGRA presents its know-how in the implementation of HVAC installations in wineries, based on its long experience in building ventilation, air conditioning and heating systems in various industries. Each project has its own requirements regarding maintenance of microclimate parameters throughout the whole production process.

Air conditioning, Ventilation »

[18 May 2015 | 1,280 read]
“TANGRA” performed ventilation, air conditioning and heating installations in a factory for the production of LED lighting and printed circuit boards.

At the end of 2014 the company “TANGRA” completed ventilation and air conditioning systems in the factory for production of Light Emitting Diode (LED) lighting and electronic circuits printed boards of the company “Intelligent Systems of Security” Ltd.

Air conditioning, Energy Saving, Heating, Specials, Titles, Ventilation »

[4 Feb 2015 | 1,488 read]
Analysis of the possibilities for energy recovery through recuperation in the ventilation and air conditioning systems.

It seems the discussion for the necessity of energy recovery systems is over not only in Western and Northern European countries, but also in Bulgaria. For the people who made serious effort for convincing and proposing legislative changes in the last 20 years, it is a real success. Today it is rare to see a ventilation or air conditioning project without energy recovery (recuperation or regeneration).

The economic pressure (rise of energy prices) surpassed the legal regulations. Designers and investors reacted more adequately than the legislators.

The next important step is the choice of the right energy recovery system. The right choice means a cost-effective choice that doesn’t compromise the microclimate.

Air conditioning, News, Ventilation »

[21 Jul 2014 | 2,030 read]
TANGRA built the ventilation and air conditioning systems of the new Russian restaurant Druzya

In May 2014 was opened the newest restaurant in Sofia – Druzya. The complex is situated on two floors, where are placed two wide restaurant halls, a playground and a terrace. The restaurant offers both traditional Russian and European kitchen.